Project library

This page includes documents written throughout the project, for public meetings/open houses, and reference materials that were developed separate from this project.

Project Documents

2015

2014

2013

2012

2008

2007

2006

 

Public Event Materials

June 11, 2014 – Open House

May 8 and 17, 2012 – Public Hearing/Open House

November 8 and 14, 2007 – Open House

June 26 and 27, 2007 – Open House

December 6 and 7, 2006 – Open House

 

Reference Materials

  • Willamette River Crossing Capacity Study General Corridor Evaluation (34KB, PDF) – Executive Summary – This evaluation addresses the issue of providing additional transportation capacity across the Willamette River in or near the Salem-Keizer area. The full document is very large, however, it can be downloaded on the Salem-Keizer Area Transportation Study (SKATS) Web site.
  • Willamette River Bridgehead Engineering Study (161KB, PDF) – Executive Summary – The primary goal of the Bridgehead Engineering Study is to devise and report on possible operational and physical improvements that would improve traffic conditions and prolong acceptable levels of service on the Marion Street and Center Street Bridges. The study focuses on improvements to the bridge ramps and other streets and facilities in the study area.
  • Salem Transportation System Plan – Read the Salem Transportation System Plan (TSP) on the City of Salem’s Web site.
  • Regional Transportation System Plan – Read the SKATS Regional Transportation Systems Plan (RTSP) on the Salem-Keizer Area Transportation Study’s Web site.